- Develop SIT test procedures and P.Eng Stamp
- Review all requirements to develop dynamic testing procedures involving multiple systems
- Work with design to develop construction staged testing strategy (P1, TZ1, TZ2, Regression)
- Review ICDs against design requirements for Validation method.
- review with T&C team subsystem requirements for SIT and interface staging against construction stages
- Derive requirements from project functional plans
o Gerry Wright OMF Building B Parametric Programming report. Gerry Wright Requirements & Derived requirements for SIT & SIT/LRV
o Power System Study - Requirements & Derived for SIT, SIT& LRV,
o Operational Analysis document
- Manage and update project Systems configuration state document - against project discussions and developments
- Review operational DDCRs and refine validation methods against location & readiness
- Develop pre-requisites for T&C and manage schedule for readiness for major system SITs.
- Develop and work with performance demonstrations criteria.
- Be part of T&C on site during testing, organize readiness and drive works
- SITs to be produced & stamped but not limited too.
o Line of sight - distance reaction times
o Headway, min max operational speed in each section/ direction/ failure
o Acceleration / deceleration characteristics with AW loading
o Dynamic tests proving RAMs
o Degraded mode operations SIG, POWER, Track, Comms - Against operation processes
o Series - multiple LRV tests, load monitoring, harmonics, failure and rescue scenarios.
o Any testing against SOP